Ok so here are my issues with the pic jordN posted.
The cars/train in the pic do resemble the cobra's train bur do not have any OTSR's installed. I say this because when Vekoma delivered the train for Cobra it already had the OTSR's and padding on. (At least from my understanding of the pics) :
http://viewmorepics.myspace.com/index.c ... Id=1127555Furthermore, assuming that there are cars inside the two crates, which from the looks of things it does look like they are holding cars, there are only 6 cars. This is a puzzling issue because Cobra and Cyclone both have trains consisting of 7 cars long. (yes I know maybe all the cars haven't been delivered yet)
Look close enough at jordN's pic and you can almost make out a row number on the side of the one care and it looks like a 2,3, or an 8.
Given that Cobra is running this is certainly a mystery....where's Scooby when you need him.

There is an easy fix though. If Carowinds really wanted to, they could remove Cobra's train, repaint the logo and stick it on Cyclone with this "new" train. And stick another train on Cobra (if we get a different color train). Then again two trains painted differently would go well with the "Identity Crisis" paint theme of Cyclone. That way they could leave Cobra's train alone.
IF we were to get new trains, it wouldn't take more than a week or two to install them and test them. Given that Cyclone has already passed safety inspections by the states, it wouldn't be too much trouble to add new trains test them and have the inspectors come and look over the ride a second time. It would actually go faster than you are making it out to be coasteraddict02. A lot of things would go unchanged- speed, G's, that sorta thing - just making sure the trains work correctly would be the big thing.
Hey jordN or Wormmy, can any of y'all keep us posted with pics if you get a chance and if anything happens like the arrival of more cars?