- May 28th, 2015, 10:21 pm
#78522
anyone remember CP's todo list? I dont recall what the list was about but it does say purchase aquatrax.
http://www.ohio.com/blogs/airtime/airti ... n-1.518878
1. Call RMC (Referencing the Rocky Mountain Construction company that is working with Six Flags to convert its wooden coasters into the new hybrids)
2. Purchase AquaTrax (A new ride track that creates water roller coasters)
3. Relocate Mantis (There is a theory that the park will not only switch out the coaster cars on the Mantis, but also move its entrance to the Blue Streak midway to create more traffic in that area of the park)
4. Build a dark ride (Speculation has the park putting in a werewolf-themed dark ride in the old Pirate Ride building)
5. Go over 500 feet (The new so-called Polercoasters essentially send riders straight down the side of a tall tower)
6. Coaster tunnel into Lake Erie (this is a new one)
7. Build boardwalk (there might be something to this one as the park heavily promoted its beach parties and fireworks this summer)
http://www.ohio.com/blogs/airtime/airti ... n-1.518878
1. Call RMC (Referencing the Rocky Mountain Construction company that is working with Six Flags to convert its wooden coasters into the new hybrids)
2. Purchase AquaTrax (A new ride track that creates water roller coasters)
3. Relocate Mantis (There is a theory that the park will not only switch out the coaster cars on the Mantis, but also move its entrance to the Blue Streak midway to create more traffic in that area of the park)
4. Build a dark ride (Speculation has the park putting in a werewolf-themed dark ride in the old Pirate Ride building)
5. Go over 500 feet (The new so-called Polercoasters essentially send riders straight down the side of a tall tower)
6. Coaster tunnel into Lake Erie (this is a new one)
7. Build boardwalk (there might be something to this one as the park heavily promoted its beach parties and fireworks this summer)


