It looks like the piece closest to the person taking the picture from the link on page 66 is for the lower part of the helix to me. I'm so excited

also, is it possible that they work backwards from the brake run into the small camel backs with the smaller cranes, or will they just wait until the large crane gets here to do the rest? It seems like a lot of the ride could be done with the cranes already on site, but I assume once the big crane arrives all the pieces will the put into place using that. And if they poured the last footer today, I think they will start very very soon on the lift. By the time they get to that portion of the ride, those footers would be cured well enough to put the track in place. What a great time! Football is here, basketball is starting back, its almost Christmas and Fury is about to reach for the sky. What a time to be alive haha