- May 22nd, 2009, 5:45 pm
#27783
I really try not to bitch and stuff a lot, but the past two weeks have been disappointing to say the least.
Last Saturday a friend wanted to go to the park, and I went along to hang out and stuff.
Thunder Road had a huge line and they were running 1 train and only 1 side. Nighthawk had a huge line and only 1 train running.
Today Thunder Road had all their lines full, and they were running 1 train, 1 side.
Hurler was completely full inside and was starting to back up to the stairs. And they were running 1 train.
What is the deal these days? They started out really good the first few weeks. Today I felt like I was at SFOG back when they were too lazy to put on second trains.
The one saving grace today was the Afterburn crew who were getting trains out as fast as possible.
Last Saturday a friend wanted to go to the park, and I went along to hang out and stuff.
Thunder Road had a huge line and they were running 1 train and only 1 side. Nighthawk had a huge line and only 1 train running.
Today Thunder Road had all their lines full, and they were running 1 train, 1 side.
Hurler was completely full inside and was starting to back up to the stairs. And they were running 1 train.
What is the deal these days? They started out really good the first few weeks. Today I felt like I was at SFOG back when they were too lazy to put on second trains.
The one saving grace today was the Afterburn crew who were getting trains out as fast as possible.
Coaster Count - 203

